Adams County
450 kW Rooftop Solar Installation at Human Services Building
TEN developed and is implementing a 450 kW-dc rooftop solar photovoltaic system at the Adams County Human Services Building. The project was designed to maximize on-site solar generation while aligning with building load requirements and the local electric cooperative’s interconnection standards. The system supports the County’s long-term energy cost reduction and sustainability goals.

Services Performed
Solar PV System Design & Installation
- Designed electrical systems and racking layout for a 450 kW-dc rooftop solar array
- Installed complete system including 900 solar modules, 1,275 racking bays, six inverters, and a data acquisition system
Electrical Interconnection & Utility Coordination
- Managed utility interconnection process, including application submission and system impact analysis
- Coordinated system requirements with the electric cooperative
Structural & Roof Protection Coordination
- Coordinated with the County’s structural engineering team
- Implemented roof protection measures while preserving the existing roof warranty
Commissioning & Performance Verification
- Performed commissioning of all solar and electrical systems
Monitoring & Renewable Energy Credit Management
- Provided five years of data acquisition system monitoring
- Delivered ongoing solar renewable energy credit (SREC) acquisition services

Adams County has worked with TEN to create energy efficiency projects and, most recently, a solar array for the roof of our Human Services Building. TEN has been the model of effective project management and project communication. The team is professional, responsive and show that they care about the customer. It is a pleasure to work with them.
Molly Mudd
Adams County Solicitor
Project Size
$126379KEnergy Savings
$126379K