New Kensington-Arnold School District
NEW KENSINGTON-ARNOLD SCHOOL DISTRICT
TEN executed a district-wide energy project, upgrading HVAC, controls, and the building envelope across four schools. Key improvements included natatorium HVAC upgrades, window and masonry repairs, and domestic hot water system replacements to maximize energy savings and infrastructure resilience.


At every point in the planning, development, and construction phases, TEN’s team valued our input and incorporated our suggestions into the project. Their expertise has allowed the District to achieve a better learning environment and a financially sound project.
Jeffery McVey
Director, Administrative Services | New Kensington-Arnold School District

By The
Numbers
- $126379M
Project Size
- $126379K
Annual Savings Realized

TEN's Project
Team Delivered
- Upgraded HVAC, controls, and building envelope
- Replaced pool boiler and upgraded natatorium HVAC
- Installed brick veneer, coping, flashing, and water repellent
- Repointed piers, infilled vents, and added weep holes
- Replaced failed window glass and repaired flashing in classrooms
- Upgraded domestic hot water systems
- Repaired downspouts, scuppers, and exterior masonry