TEN executed a district-wide energy project, upgrading HVAC, controls, and the building envelope across four schools. Key improvements included natatorium HVAC upgrades, window and masonry repairs, and domestic hot water system replacements to maximize energy savings and infrastructure resilience.

New Kensington-Arnold School District
At every point in the planning, development, and construction phases, TEN’s team valued our input and incorporated our suggestions into the project. Their expertise has allowed the District to achieve a better learning environment and a financially sound project.

Jeffery McVey

Director, Administrative Services | New Kensington-Arnold School District

By The
Numbers

  • $126379M

    Project Size

  • $126379K

    Annual Savings Realized

TEN's Project
Team Delivered

  • Upgraded HVAC, controls, and building envelope
  • Replaced pool boiler and upgraded natatorium HVAC
  • Installed brick veneer, coping, flashing, and water repellent
  • Repointed piers, infilled vents, and added weep holes
  • Replaced failed window glass and repaired flashing in classrooms
  • Upgraded domestic hot water systems
  • Repaired downspouts, scuppers, and exterior masonry
Headquarters
1501 Reedsdale Street
Suite 401
Pittsburgh, PA 15233
Harrisburg
800 North 3rd Street
Suite 203
Harrisburg, PA 17102
Philadelphia
600 Germantown Pike
Suite 400
Plymouth Meeting, PA 19462
Bethesda
3 Bethesda Metro Center
Suite 700
Bethesda, MD 20814

Contact Us

© 2025 TEN. All rights reserved.

Site byActual Size