$656K Annual Savings Through District-Wide Infrastructure Upgrades

New Kensington–Arnold School District partnered with TEN to deliver a district-wide energy project across four schools, modernizing HVAC systems, controls, and the building envelope to improve learning environments, resilience, and long-term energy performance.

New Kensington-Arnold School District

Services Performed

  • HVAC & Mechanical System Improvements

    • Upgraded HVAC systems across four schools
    • Replaced pool boiler and upgraded natatorium HVAC systems
    • Upgraded domestic hot water systems
  • Building Automation & Controls

    • Upgraded building control systems to optimize performance and energy efficiency
  • Building Envelope & Thermal Efficiency

    • Installed new brick veneer, coping, flashing, and water repellent
    • Repointed masonry piers, infilled vents, and added weep holes
    • Repaired downspouts, scuppers, and exterior masonry
  • Window & Façade Repairs

    • Replaced failed window glass in classrooms
    • Repaired flashing to improve weather resistance and thermal performance
At every point in the planning, development, and construction phases, TEN’s team valued our input and incorporated our suggestions into the project. Their expertise has allowed the District to achieve a better learning environment and a financially sound project.

Jeffery McVey

Director, Administrative Services | New Kensington-Arnold School District

  • Project Size

    $126379M
  • Annual Savings Realized

    $126379K
TEN
Headquarters
1501 Reedsdale Street
Suite 401
Pittsburgh, PA 15233
Harrisburg
800 North 3rd Street
Suite 203
Harrisburg, PA 17102
Philadelphia
600 Germantown Pike
Suite 400
Plymouth Meeting, PA 19462
Bethesda
3 Bethesda Metro Center
Suite 700
Bethesda, MD 20814

© 2026 TEN. All rights reserved.