Somerset Area School District
SOMERSET AREA SCHOOL DISTRICT
TEN executed district-wide upgrades through a multi-phased approach, first modernizing aging infrastructure, replacing coal boilers with natural gas systems, and upgrading roofs, windows, and doors. The project implemented energy-saving measures like LED lighting and high-efficiency boilers, reducing operating costs and emissions while improving building comfort and security. These upgrades addressed critical needs while advancing the district's long-term sustainability goals.


"TEN has been outstanding since the inception of the project. They are very accommodating to any changes that arise. We are in the early stages of the project and could not be happier with the outcome so far. The entire TEN team is excellent."
Leanne Heiple
Business Manager | Somerset Area School District

By The
Numbers
- $126379M
Total Project Size
- $126379K
Total Annual Savings Realized

TEN's Project
Team Delivered
Multiple phases of work totaling $12.4 million
- Upgraded all LED lighting and an emergency generator
- Complete auditorium renovation
- Replaced domestic hot water systems
- Installed new high-efficiency condensing gas boiler plant
- Replaced door access and control system
- Upgraded auditorium audio visual equipment
- Replaced roof and windows at Somerset Area Middle School
- Upgraded Family Consumer Science Room at Junior/Senior High School
- Installed new high efficiency condensing boiler plant at Eagle View Elementary School
- Completed metal roof restoration/retrofit at Eagle View Elementary School
- Saved district costs by retrofitting existing roof (funds redirected to future elementary renovations)
- Installed new roof-hugger framing system over existing metal roof
- Added R19 fiberglass insulation to existing roof panels
- Attached new standing seam metal roof to retrofit framing
- Removed existing dormers and rerouted ventilation exhaust/intake systems
- Completing design for a large GESA renovation that includes Eagle View and Maple Ridge Schools