TEN Logo

State Correctional Institution Houtzdale

Central Utility Plant Modernization & Facility-Wide Energy Upgrades

TEN served as the prime contractor to modernize the aging central utility plant at the 1,500-bed State Correctional Institution in Houtzdale, Pennsylvania. Completed in July 2023, the project upgraded critical systems while minimizing disruption in an occupied facility. The improvements enhanced energy efficiency, reliability, and overall operational performance.

State Correctional Institution Houtzdale

Services Performed

  • Lighting Upgrades

    • Completed a lighting retrofit with 7,000 LED fixtures
  • HVAC & Mechanical System Improvements

    • Replaced heating and cooling distribution lines to the entire facility
    • Upgraded to variable flow hot water pumping systems and modern plant controls
  • Central Plant & Chiller Improvements

    • Converted central steam plant to compressed natural gas
    • Constructed a compressed natural gas unloading facility
    • Installed two new 350-HP boilers and refurbished two existing units
    • Added three new 400-ton chillers with cooling towers
  • Building Automation & Controls

    • Implemented a new BACnet building automation system with fiber-optic infrastructure, variable frequency drives, and unit controllers
  • Project Size

    $126379M
  • Annual Savings

    $126379M
  • Utility Rebates

    $126379K
  • kWh Annual Electricity Savings

    126379M
  • MCF Natural Gas Reduction

    126379
  • kgal Water Conserved

    126379
TEN
Headquarters
1501 Reedsdale Street
Suite 401
Pittsburgh, PA 15233
Harrisburg
800 North 3rd Street
Suite 203
Harrisburg, PA 17102
Philadelphia
600 Germantown Pike
Suite 400
Plymouth Meeting, PA 19462
Bethesda
3 Bethesda Metro Center
Suite 700
Bethesda, MD 20814

© 2026 TEN. All rights reserved.